[FS_Energy_ph2_MED] Work Plan v0.4
This document presents revision 0.4 of the Work Plan for the Study Item "Study on Media Energy Consumption Exposure and Evaluation Framework phase 2" (FS_Energy_ph2_MED). The study was approved at SA4#132 (S4-251182) and SA#108 (SP-250636).
The study addresses incomplete work from TR 26.942 v2.0.0 due to dependencies on other 3GPP groups. The phase 2 study aims to:
- Incorporate new information from completed 3GPP work
- Address key issues identified but not resolved in phase 1
- Propose new potential solutions
The study addresses new Rel-20 requirements in the media delivery context:
Clause 6.15a.2 - Energy-related information as service criterion:
- Media delivery performance degradation (QoS adjustment, bit rate modification, deferring Background Data Transfers) in response to network energy supply mix changes or energy rationing
- Per-UE energy saving actions based on subscription policies, including blocking media delivery
- Mechanisms to assist Media Application Providers in identifying UEs for performance degradation and energy saving actions
- All subject to operator policy, regulatory requirements, and user consent
Clause 6.15a.5 - Energy-related information exposure:
- Exposure to UEs and authorized third parties over specific time periods
- Network energy consumption and equivalent CO2e emissions for overall media delivery service and individual application data flows
- Subject to operator policy, regulatory requirements, and user consent
Update or develop existing potential solutions incorporating new elements from TS 23.501, TS 23.502, and TS 23.503, including:
- Energy Information Function (EIF)
- Efficient energy use mechanisms
- Energy saving items
Propose solutions for key issues on:
- Energy-related monitoring and measurement during media consumption
- Evaluation frameworks without identified normative work
a. Energy-related configuration by Media Application Service Provider:
- How ASPs can configure energy-related information collection and exposure
b. AS Energy Management:
- How 5GMS AS (and RTC System equivalent functions) react to energy-related information from the network via Energy Information AF instantiated in 5GMS AF and/or Energy Information Collector
c. Client Energy Management:
- How 5GMS Client (and RTC System equivalent functions) react to network-shared energy-related information
- Leverage existing QoS optimization mechanisms in RTC/5GMS for energy efficiency optimization
Original Plan: Completion by March 2026 (SA#111)
Revised Plan: Completion postponed to June 2026 (SA#112)
Rationale:
- Original timeline too ambitious for two SA4 meetings
- Additional two SA4 meetings provided
- Addresses Rel-20 SA1 requirements while respecting Rel-20 Stage 2 freeze
- Stage 2 addressed in single meeting, Stage 3 in two meetings
Key Decisions to Enable Revised Timeline:
- No new candidate solutions accepted after SA4#135
- Consensus on Stage 2 draft WID during SA4#135-bis e-meeting
- Begin Stage 2 Technical Specification work before WID approval at SA#112 by submitting discussion papers to SA4#135-bis and/or SA4#136
- Early drafts of TS 26.nnn V0.0.1/V0.0.2 based on agreed baseline of Solution 5
The document proposes the above Work Plan for SA4 team consideration.