Summary of S4-260149: Updates on Assumptions and Open Issues for NB-IoT GEO Simulation
Document Overview
This contribution from China Mobile addresses outstanding assumptions and open issues for NB-IoT GEO satellite simulation work within the ULBC (Ultra-Low Bitrate Codec) study. The document consolidates discussions from multiple Audio Ad-hoc meetings (June 4, June 17, and July 11) and proposes updates to TS 26.940 clause 5.2.2.4.
Main Technical Contributions
Status Updates on Simulation Parameters
The document provides a comprehensive status table tracking 11 key simulation issues, with updates on their resolution status:
Resolved Issues
- UE Power Class (Issue 1):
- Previously pending decision between 23 dBm (specified for NTN NB-IoT) vs. higher commercial values (26-33 dBm)
- Resolution: 37 dBm adopted based on RAN4 Reply LS S4aA250219
-
Note: 37 dB is under study in ongoing RAN work
-
Latitude-Dependent Loss (Issue 2):
- Addressed scintillation loss variation (2.2 dB vs. 0 dB) based on latitude per TR 38.821
- Resolution: Simulation accounts for latitude-dependent loss using X term
-
Additional note: New 10-degree channel model introduced, may increase feasible TBS
-
Elevation Angles (Issue 3):
- Proposal to maintain both 2.3° and 12.5° elevation angles for worst-case scenarios
-
Resolution: Simulation accounts for elevation angles using X term
-
Simulation Channel Model (Issue 8):
- Choice between NTN-TDL-C or NTN-TDL-C5
-
Resolution: NTN-TDL-C is used
-
Repetition Numbers (Issue 10):
- Proposal to specify and report repetition numbers in simulation
- Resolution: Solved
Partially Resolved Issues
- Protocol Overhead (Issue 9):
- Requires clarification of packet header overhead for different protocol combinations (user plane, control plane, IP vs. non-IP)
- Partial Resolution: SA2 confirmed voice packets transported over User Plane
-
Still Pending: Overhead for User Plane (IP vs. Non-IP) needs RAN confirmation
-
RX G/T for Downlink (Issue 11):
- Field measurements show 3dB better value than current RAN assumptions
- Status: Editorial note added in P-doc 5.2.2.3 to capture field-measured data
- Current Status: Listed as "Unsolved" in table
Unresolved Issues
- UL/DL Guard Time (Issue 4):
- Current assumption: 1 ms guard time for UL/DL switching
-
Status: Needs RAN confirmation on feasibility
-
Determine Candidate TBS Values (Issue 5):
- Multiple proposals from different companies:
- Xiaomi (S4aA250035)
- Fraunhofer (S4aA250031)
- Skylo (S4-251540)
- Dolby (S4-251390)
- Huawei (S4aA250230)
- Qualcomm (S4-251548)
- vivo (S4aA250215)
-
Status: Unsolved, requires further verification
-
Approaches to Select TBS (Issue 6):
- Three approaches provided in S4aA250072
- One approach detailed in clause 5.2.2.4.1
- Status: Unsolved, requires further discussion
-
Overall Simulation Methodology Description (Issue 7):
- Need for high-level description of simulation execution, including optimization parameters and result parameters
- General description documented in P-doc Clause 5.2.2
- Status: Unsolved, to be addressed after all simulation work completed
Proposal
The document proposes to:
1. Update the P-doc (TS 26.940) based on the status updates provided
2. Continue tracking these issues until full resolution
Key Dependencies
The document highlights several dependencies on other working groups:
- RAN4: UE power class confirmation
- RAN: UL/DL guard time feasibility, protocol overhead confirmation
- SA2: Protocol overhead for different transport configurations