Unknown
S4-260326 / TSGS4_135_India / 7.8 / Qualcomm Incorporated / Reply LS on on the RAN simulation assumptions,...
Previous Next
S4-260326

Reply LS on on the RAN simulation assumptions, bundling period and SPS for ULBC

Source: Qualcomm Incorporated
Meeting: TSGS4_135_India
Agenda Item: 7.8

All Metadata
Agenda item description FS_ULBC (Study on Ultra Low Bitrate Speech Codec)
Doc type LS out
For action Approval
Original LS R2-2507790
download_url Download Original
Cc RAN1, SA2, CT1
To RAN2
For Approval
Type LS out
Contact Ma Liangping
Uploaded 2026-02-12T06:57:54.037000
Contact ID 91234
Revised to S4-260462
TDoc Status revised
Reservation date 11/02/2026 04:33:47
Agenda item sort order 20
Review Comments

No comments yet.

Sign in to add comments.