S4-260006 - AI Summary

Brief report from SA#110 on SA4 topics

Back to Agenda Download Summary
AI-Generated Summary AI

SA#110 Brief Report on SA4 Topics

General Information

Meeting Details:
- SA#110 took place 9-12 December 2025, hosted by ATIS in Baltimore, US
- SA4 Chair: Gilles Teniou (Tencent/CCSA)
- Report presented at SA4#135 in Goa, India (9-13 February 2026)

Overall Outcome Summary

The SA4 report to SA#110 was noted. Key approvals included:
- All SA4 CRs (Rel-12, Rel-17, Rel-18, Rel-19) were approved
- Draft TS 26.251 V2.0.0 (IVAS_Codec_Ph2) was approved
- IVAS verification test lab reports were approved
- SA4 chair input on WG Terms of Reference was sent back to SA4 for further discussion

Key Plenary Discussion Points

Workload Concerns:
- Verizon raised concerns about SA4's capacity given the large number of proposed TRs, citing slow progress on FS_ULBC
- SA4 Chair clarified that slow progress was due to dependencies and related issues, not workload
- TSG SA Chair requested companies to prepare contributions on workload issues rather than raising them in the Chair report

ToR and AI Work:
- MediaTek commented on the postponed SA4 ToR and emphasized the need to progress AI-related studies
- TSG SA Chair indicated that SA4 ToR requires consensus within SA4 before TSG SA approval

6G Planning:
- TSG SA Chair requested information on 6G planning for the next TSG SA meeting

IVAS Verification Reports

All test lab reports for IVAS Characterization Phase were approved:
- MESAQIN.com Listening Lab Report (SP-251447)
- FORCE Technology Listening Lab Report (SP-251448)
- Global analysis lab report

New Release 20 Work Items

Work Item (WID)

Terminal Audio Quality Performance and Test Methods (SP-251352)
- Status: Approved

Study Items (SIDs)

1. Study on Evaluation of QUIC-based Protocols for On-demand and Live Video Services (FS_QStream-MED) - SP-251353
- Status: Approved (revised to SP-251659)
- Allocated TR numbers: TR 26.835 and TR 26.934

2. IMS Data Channel Enhancements (SP-251354)
- Status: Approved (revised to SP-251660)
- Allocated TR number: TR 26.814

3. QUIC-based Media Delivery for Real-time Communication (FS_Q4RTC-MED) - SP-251355
- Status: Approved (revised to SP-251661)
- Allocated TR number: TR 26.836
- Clarification: Focused on 5G but will consider new aspects introduced by 6G

4. Study on Image Formats (SP-251356)
- Status: Approved (revised to SP-251662)
- Allocated TR number: TR 26.892

5. Study on Avatar Communication Phase 2 (SP-251357)
- Status: Approved (revised to SP-251663)
- Revision: Removed repeated supporting company

6. Study on Media Aspects for 6G System (SP-251620)
- Status: Approved (revised to SP-251652)
- Allocated TR number: TR 26.870
- Rapporteurs:
- Primary: Thomas Stockhammer (Qualcomm) - coordination of the study
- Secondary: Elmira Ramazanirend (Vodafone) - Draft TR edition
- Key Revisions:
- AN and Others impacts changed to "Don't Know"
- SA5 included for charging and management impacts
- SA1 included in objective 6 for service requirements
- Additional supporting companies added
- Non-3GPP member removed

Specifications for Approval

Draft TS 26.251 v2.0.0 - IVAS Codec Phase 2 (SP-251444)
- Status: Approved (Rel-19)
- Contains fixed-point C code of the IVAS codec as electronic attachment (IVAS Software Version 3.0)
- Provides full and bit-exact EVS codec functionality for mono speech/audio signal input
- Optimized for encoding/decoding of stereo and immersive audio formats including:
- Multi-channel audio (5.1, 5.1.2, 5.1.4, 7.1, 7.1.4)
- Scene-based audio (Ambisonics up to order 3)
- Metadata-assisted spatial audio (MASA)
- Object-based audio (ISM up to 4 ISMs)
- Combined formats: OSBA and OMASA
- Supports rendering including binaural rendering for headphones with head-tracking

Change Requests

EVS_Codec CRs (SP-251429)
- 8 CRs to TS 26.445 (Rel-12)
- Status: Approved
- Note: Huawei commented that CRs to old frozen releases should be discouraged and only accepted for real FASMO corrections
- These CRs corrected references to other clauses

All other SA4 CRs:
- All Rel-17, Rel-18, and Rel-19 CRs submitted for approval were approved as is
- Admin CRs on TS 26.512 were approved

Liaison Statements

LS on External Resource Handling in IMS Data Channel

Incoming LS from GSMA NG UPG (SP-251301)
- Status: Noted
- SA4 Response (SP-251622, revised to SP-251693): Approved
- Issue: Ambiguity in handling external resource access in IMS Data Channel applications
- SA4 Position:
- Acknowledged gaps in current TS 26.114 specification
- Originally assumed DCSF and DC AS would be exclusive hosts for all content
- Did not anticipate scenarios involving external resources
- Plans to study this issue and provide clarifications as part of DC Enhancements (FS_DCE_MED) study in Release 20

LS on Traffic Model Study in RAN WG1

Incoming LS from RAN WG1 (SP-251304)
- Status: Noted (SA in CC)
- SA4 recognizes importance of defining traffic models reflecting realistic traffic characteristics
- SA4 will provide input as work progresses for AI/ML Services and immersive communication services

Work Item Summaries

1. IVAS_Codec_Ph2 (SP-251375)
- Source: vivo Mobile Communication Co., Ltd. (Rapporteur)
- Status: Endorsed

2. Video Operating Points - Harmonization and Stereo MV-HEVC (VOPS) - SP-251503
- Source: Apple Switzerland AG
- Status: Endorsed

AI Traffic Characteristics Discussion

Key Issue:
- Several contributions (SP-251553, SP-251499, SP-251540, SP-251576, SP-251452) attempted to structure work on identifying AI/ML data traffic characteristics, proposing SA4 as lead WG
- Concerns raised by some companies that SA4 should not be the exclusive WG for AI traffic characteristics
- Tentative way forward proposed in SP-251625 but no consensus reached
- Document was noted with no action to SA4

SA4 Chair Position:
- Work in other WGs should not interfere with SA4's planned work on AI traffic characteristics in the context of media services
- SA4 should proceed with its work, report progress to SA (and potentially RAN WGs), and let them decide applicability to other cases beyond media applications

Other Business

Study on 3GPP AI/ML Consistency Alignment (FS_AIML_CAL)

  • Study completed
  • Draft TR 22.850 approved (SP-251698)
  • LS to be sent to WGs for information

Study on Modernization of Specification Format and Procedures for 6G

  • Draft TR 21.802 presented for information
  • Status: Noted (SP-251617)

Release 21 Timeline Discussion

Key Points:
- Release 21 is the release for submission to IMT-2030 (6G)
- 3GPP normative work will be submitted to ITU-R before 2030
- ASN.1/OpenAPI freeze date is no earlier than March 2029
- Previous decision: Rel-21 timeline to be decided no later than June 2026
- Some groups (SA1, RAN Plenary) will finish Rel-20 work before June 2026

Timeline Planning:
- Joint session organized at TSG#111 (March 2026) for companies to share views on Rel-21 timeline
- TSG Chairs will provide joint input paper outlining proposed Rel-21 timeline
- Some Rel-21 dates (e.g., Stage-1 freeze) may be tentatively agreed at TSG#111
- Final approval of Rel-21 timeline targeted for TSG#112 (June 2026)
- First Rel-21 SID proposed at SA#110 (from SA1)

Guidance and Actions to SA4

No particular guidance was provided to SA4.

Action: SA4 will report progress and plans related to AI traffic characteristics at the next SA plenary.

Document Information
Source:
SA WG4 Chair
Type:
report
For:
Information
Original Document:
View on 3GPP
Title: Brief report from SA#110 on SA4 topics
Agenda item: 5.2
Agenda item description: Other 3GPP groups
Doc type: report
For action: Information
Contact: Gilles Teniou
Uploaded: 2026-02-03T12:04:58.537000
Contact ID: 88256
TDoc Status: noted
Reservation date: 14/01/2026 09:28:28
Agenda item sort order: 7