# Extracted Proposals

Proposal: Given the volume of contributions on FS_Energy_Ph2_MED, along with the various key points, conclusions, and recommendations to be discussed, it is proposed to delay the completion of the study by one SA meeting. Instead of finalizing the study and initiating the Stage 2 Work Item with the proposed normative work during SA4#135, the study would be completed, and the Stage 2 Work Item Description would be agreed during SA4#136.

To facilitate the Stage 2 completion in one SA meeting, it is proposed to:

Prevent the submission of candidate solutions, that have not already been discussed, after SA4#135.

Reach a consensus on a Stage 2 draft WID during the SA4#135-bis e-meeting.

Begin work on the new Stage 2 Technical Specification prior to WID approval at SA#112 in June by submitting discussion papers to the SA4#135-bis e-meeting and/or at SA4#136. These papers would include early drafts of TS 26.nnn V0.0.1/V0.0.2, based on the agreed baseline of Solution 5.